Sizing Vacuum Equipment for Thermoforming: A Duty-Point Method

Sizing vacuum equipment for thermoforming requires mold volume, target pressure, evacuation time, leakage and receiver recovery. The selected machine must supply enough effective capacity at the actual suction pressure to meet the forming cycle, while remaining within its allowable pressure difference, temperature, speed and power limits.

The first decision is how the vacuum source will serve the process. It may evacuate the mold directly, restore a receiver between cycles or act as a booster with a backing pump. These arrangements have different pressure profiles and sizing requirements. A catalogue flow figure alone cannot establish the correct duty.

Define the Duty and Pressure Basis

Collect process data before selecting a pump or blower. The required capacity depends on the volume being evacuated, the target pressure, the time allowed and the losses between the machine and mold.

Record:

  • Mold cavity, forming box, manifold and pipeline volumes.
  • Initial and target absolute pressures.
  • Maximum evacuation time and vacuum-hold period.
  • Cycle rate and available recovery time.
  • Receiver volume and upper and lower pressure setpoints, if installed.
  • Expected leakage and other gas loads.
  • Inlet-air temperature, site altitude and local atmospheric pressure.
  • Dust, plastic fines and moisture conditions.
  • Required turndown and operating schedule.
  • Number of machines that may demand vacuum simultaneously.
  • Whether the source operates as the main vacuum pump, a receiver pump or a booster.

Use absolute pressure for vacuum calculations. Gauge pressure is measured relative to local atmosphere, which varies with altitude and weather. If gauge pressure is signed, the conversion is

Absolute Pressure Calculation

pabs  =  patm  +  pg
pabs  =  patm  −  pvac,gauge
where:
  • pabs = absolute pressure
  • patm = atmospheric pressure
  • pg = gauge pressure
  • pvac,gauge = positive vacuum magnitude reported by a vacuum gauge

At local atmospheric pressure of 1,000 mbar, a gauge reading of −500 mbar corresponds to approximately 500 mbar absolute. At a high-altitude site, the same gauge reading represents a different absolute pressure and therefore a different pressure difference across the machine. The forming force also depends on the difference between atmospheric pressure outside the sheet and pressure inside the mold.

Clarify the equipment arrangement early. A roots blower intended for positive-pressure air service is not automatically suitable for vacuum operation. A Roots vacuum booster normally operates with a backing pump and has its own limits for inlet pressure, discharge pressure, temperature and differential pressure. A booster’s performance data cannot be inferred from a positive-pressure blower catalogue.

Calculate Direct Evacuation and Receiver Recovery

For a simplified sealed volume, the required effective pumping speed can be estimated from:

Effective Pumping Speed

Seff  = 
V
t
×  ln
(
p1
p2
)
where:
  • Seff = effective pumping speed at the evacuated volume
  • V = total connected volume
  • t = evacuation time
  • p1, p2 = initial and target absolute pressures

The expression assumes constant effective pumping speed, negligible leakage and outgassing, and a pump’s limiting pressure well below the target. It also assumes no significant restriction between the pump and the mold.

For example, let the mold, manifold and connecting volume total 0.30 m³. If pressure must fall from 1,000 mbar absolute to 300 mbar absolute in 1.0 second, the calculation gives:

Seff = (0.30 / 1.0) × ln(1,000 / 300)

Seff ≈ 0.361 m³/s ≈ 1,300 m³/h

This is the idealized speed required at the mold connection, not the blower’s catalogue capacity. The installed equipment may need more nominal capacity because valves, pipes, filters and mold ports create restrictions. Leakage also adds gas load. Treating the result as a final selection value would likely understate the duty.

In a real circuit, pressure is not uniform during rapid evacuation. A sensor at the vacuum source can show a different pressure from a sensor at the mold because the connecting line and valves restrict flow. The design should therefore distinguish pump-inlet capacity from effective capacity at the mold. If port or line losses are substantial, calculate them at the peak-flow condition or validate the system through a representative test.

Where leakage is known as pressure-volume throughput, its contribution can be estimated at a target pressure using

Leakage Pumping Speed

Sleak  ≈ 
qleak
ptarget

The units must be consistent: for example, qleak in Pa·m³/s and pressure in Pa gives pumping speed in m³/s. This is a steady-load estimate; it should not be added blindly to the ideal evacuation calculation when leakage changes substantially with pressure or time.

A receiver can separate the short forming peak from the slower pump-recovery duty. It buffers gas demand during the forming event, then the pump restores the receiver before the next cycle. This can reduce the instantaneous pump capacity required, but only if the receiver has enough usable pressure range and the pump can recover within the available interval.

An idealized receiver recovery estimate is:

Effective Pumping Speed (Recovery)

Seff  = 
Vr
trec
×  ln
(
phigh
plow
)
where:
  • Seff = effective pumping speed
  • Vr = receiver volume
  • trec = available recovery time
  • phigh = receiver absolute pressure after the forming event
  • plow = required absolute pressure before the next cycle

This relation assumes constant pumping speed and negligible gas inflow, leakage and line restriction.

For a 1.0 m³ receiver recovering from 600 mbar absolute to 250 mbar absolute in 8 seconds:

Seff = (1.0 / 8) × ln(600 / 250)

Seff ≈ 0.109 m³/s ≈ 394 m³/h

That value is an idealized average effective speed over the stated pressure range. The actual machine curve, connecting-line conductance, leakage and speed variation must still be checked.

Receiver volume should be determined from the gas drawn during the forming pulse and the permitted pressure rise—not selected from recovery time alone. A larger receiver can limit pressure fluctuation, but it also increases the volume that must be evacuated. A transient gas balance can compare the forming demand, receiver pressure swing, valve timing and pump recovery through the complete cycle.

If multiple thermoforming machines share a receiver or header, use the maximum credible simultaneous demand. Nominally alternating machines may overlap during faults, production changes or control transitions. The operating sequence should define which combination the vacuum source must handle.

Select Capacity at Actual Suction Conditions

A positive-displacement machine has theoretical displacement related to its swept volume and rotational speed:

Theoretical Volumetric Capacity

Qth  =  Vd  ×  n
where:
  • Qth = theoretical volumetric capacity
  • Vd = displacement per revolution
  • n = rotational speed in revolutions per second

Actual inlet capacity is lower because of internal leakage and depends on suction pressure, gas temperature, speed and machine design. For a Roots machine, slip generally increases as pressure difference increases, so useful capacity does not necessarily scale in a fixed proportion with speed.

Do not select from an atmospheric catalogue flow when the duty is at a different suction pressure. Compare performance at the actual inlet condition and across the full operating range. Data should identify inlet volume basis, rotational speed, pressure difference, absorbed power, discharge temperature and permitted continuous envelope.

Flow values also need a clear reference state. Standard flow, normal flow, free-air delivery and actual inlet flow are not interchangeable. For the same gas mass flow, ideal-gas conversion between two conditions can be written as:

Q₂ = Q₁ × (p₁ / p₂) × (T₂ / T₁)

Pressures and temperatures in this relation are absolute, with temperature in kelvin. State whether each flow value is measured at the pump inlet, mold, receiver or another location.

The machine’s pressure difference is Δp = pd − ps, where pd and ps are absolute discharge and suction pressures. If a vacuum pump exhausts to atmosphere, pd is local atmospheric pressure. Its absolute pressure ratio is

Pressure Ratio

Π  = 
pd
ps

As suction pressure falls, both the pressure ratio and differential pressure rise, affecting absorbed power and discharge temperature.

Pressure Difference

Δp  =  pd  −  ps
where:
  • Δp = machine’s pressure difference
  • pd = absolute discharge pressure
  • ps = absolute suction pressure

If a vacuum pump exhausts to atmosphere, pd is local atmospheric pressure.

Pressure Ratio

Π  = 
pd
ps
where:
  • Π = pressure ratio
  • pd = absolute discharge pressure
  • ps = absolute suction pressure

As suction pressure falls, both the pressure ratio and differential pressure rise, affecting absorbed power and discharge temperature.

Gas Power Approximation

Pgas  ≈  Δp  ×  Qs
where:
  • Pgas = gas power
  • Δp = pressure difference
  • Qs = volume flow at the suction condition

With pressure in pascals and flow in m³/s, the result is watts. Approximate shaft power is

Shaft Power

Pshaft  ≈ 
Pgas
ηpump
where:
  • Pshaft = shaft power
  • Pgas = gas power
  • ηpump = pump efficiency

; electrical input also depends on motor and drive efficiency. These simplified equations are screening tools. Roots vacuum boosters undergo external compression, and the actual power requirement depends on the machine curve, internal leakage, gas heating and operating point.

A booster duty also depends on the backing pump. The backing stage must accept the gas discharged by the booster and maintain an outlet pressure that keeps the booster within its approved differential-pressure and temperature limits. A larger booster cannot compensate for an undersized or unsuitable backing pump.

Control the Cycle, Reduce Losses and Verify the Result

The energy per cycle can be estimated as:

Electrical Energy per Cycle

Ecycle  = 
Pavg  ×  tcycle
3,600
where:
  • Ecycle = electrical energy in kWh
  • Pavg = average electrical input in kW
  • tcycle = cycle duration in seconds

For a manufacturing comparison, calculate specific energy as total electrical energy divided by the number of acceptable parts. Reporting kWh per 1,000 acceptable parts accounts for scrap associated with unstable vacuum or extended cycles.

Define the measurement boundary consistently. A vacuum-system comparison may include pumps, drives and relevant auxiliaries. A whole-line comparison may also include heating, cooling and trimming equipment, but those loads need to be included for each option. Record electrical input and production results over representative shifts, not just a short test at one ideal operating point.

Use absolute-pressure setpoints to control recovery and avoid ambiguity as local atmospheric pressure changes. A higher absolute-pressure threshold—meaning weaker vacuum—can call for increased pump speed or additional capacity. A lower absolute-pressure threshold can indicate that the receiver has recovered enough for the next cycle. Setpoints and deadband should prevent excessive motor cycling while maintaining the forming pressure profile.

Variable-speed operation, staged pumps, lead-lag control and automatic isolation of idle lines may help align capacity with demand when supported by the selected equipment. Respect minimum speed, cooling and pressure-difference limits. Continuous bypass can waste energy if the machine keeps moving gas without providing useful vacuum capacity; throttling can also add resistance and reduce effective flow. Their use should follow the pump supplier’s guidance and system analysis.

Leakage creates a continuing gas load. Common sources include worn seals, loose connections, unused branches, damaged hoses and valves that do not close fully. A pressure-rise test can help assess leakage in an isolated receiver or line:

Pressure-Volume Throughput

q  = 
V  ×  (p2  −  p1)
Δt
where:
  • q = pressure-volume throughput
  • V = isolated volume
  • p1, p2 = initial and final absolute pressures
  • Δt = test duration

Temperature should remain reasonably stable. The measured pressure rise may include gas released from internal surfaces as well as leakage, so the test does not always identify a leak by itself.

Commissioning should compare the calculated duty with measured mold pressure, receiver recovery, cycle time, pump speed, motor current and electrical input. Test the range of production conditions that affects demand, including representative cycle rates and machine combinations. The final operating window should state the target pressure profile, acceptable recovery time and permitted equipment limits.

The selection enquiry should include mold and connected-system volumes, pressure targets, evacuation and recovery times, receiver data, leakage estimate, site altitude, inlet temperature, pipeline and valve sizes, dust and moisture conditions, required control range, and simultaneous machine demand. If the machine is a vacuum booster, provide the backing-pump type and performance data as well. This duty-point information lets the supplier evaluate the actual system rather than match a catalogue number to a theoretical peak.

Glossary

Absolute-pressure setpoint: A control target referenced to perfect vacuum rather than local atmospheric pressure. It provides a consistent basis for comparing vacuum conditions across sites.
Duty point: A defined combination of flow, suction pressure, discharge pressure and operating condition. The selected equipment should meet the required duty points without exceeding its specified limits.
Effective pumping speed: The pumping speed available at the mold or receiver after losses in connecting components are considered. It can be lower than the pump’s rated inlet speed.
Electrical input power: The power drawn by the complete motor and drive during operation. Measuring it at representative cycle stages helps distinguish peak demand from average energy use.
Pressure-rise test: A test that records the pressure increase in an isolated volume over a defined period. The result may reflect both leakage and gas released from internal surfaces.
Pressure-volume throughput: Gas quantity expressed as pressure multiplied by volume per unit time. It is used to describe leakage or gas load and must be converted consistently when calculating equivalent pumping speed.
Receiver drawdown: The change in receiver pressure during a forming event as gas is withdrawn. It helps determine whether the receiver can support the peak demand without disrupting the mold-pressure profile.
Volumetric displacement: The theoretical gas volume moved by a positive-displacement machine per revolution or unit time. Delivered inlet flow differs because of internal leakage and operating conditions.